COURSE TARGETS :
After completing this course participants are expected to be able to:
* Comprehend basic principles of calculation and conduct optimization when wells production operations, oil wells, gas and geothermal reservoir implemented, develop this production optimization implementation to improve wells and fields performance and production.
* Conduct simple diagnosis and comprehend settlement problems on production wells operation of, oil wells and gas and geothermal reservoir.
* Create a simple analysis of wells oil, gas and geothermal data, forecast performance and plan production operations development
* Conduct simple quantitative calculations entire acquisition data: tubing, flowline, chokes, perforation, Gravel-pack, sub-surface safety, wells valve, plan its development by considering capability from each well.
* Practice knowledge of production operations for settlement problems occur when cementation process, handling scale, sand, corrosion and damage of oil and gas wells.n
* Understanding basic principles on design: cementation, workover, wells stimulation with acidizig and hydraulics rupture, planning workover, etc.
PRE-REQUISITE:
Backgrounds: Operator, Senior Operator, Engineer/Non Engineer
Outline Course
Geologic Considerations in producing Operation
* Introduction
* Sandstone Reservoirs
* Geologic Factors Affecting Reservoir Properties in Sandstone
* Application of Geologic concepts in Specific Sandstone
* Carbonate Reservoirs
* Application of Geologic Concepts in Carbonate Reservoirs
Reservoir Considerations in Well Completions
* Introduction
* Hydrocarbon Properties of Oil and Gas
* Recommendations of Obtaining Good Test Data
* “Eyeball” Interpretation of Pressure Charts
Primary Cementing
* Introduction
* Cementing Materials
* Cement Additives
* Cement Bonding
* Flow Properties of Primary Cements
* Displacement Mechanics
* Cost of Primary Cementing
* Special Problem Situations-New Developments
* Primary Cementing Practices
Well Completion Design
* Factors Influencing Well Completion Design
* Conventional Tubular Configuration
* Unconventional Tubular Configurations
* Sizing Production Tubular
* Completion Interval
* Permanent Well Completions (PWC)
* Tubingless Completion
Tubing Strings,Packers,Subsurface Control Equipment
* Tubing Strings
* Steel Grades
* Tubing Connections
* Makeup of API Threaded connection
* Design of Tubing Strings
* High Strength Tubing
* Physical Properties of Steel
* Sensitivities of High Strength Tubing
* Tubing Inspection
* Tubing Handling Practices
* Equipment for Use With-Strength Tubing
* Tubing Running Practices
* API Publication List
* Packers and Subsurface Control Equipment
* Production Packers
* Subsurface Control Equipment
Perforating Oil and Gas Wells
* Introduction
* Types of Perforators
* Evaluation of Perforator Performance
* Factors Aftecting Gun Perforating Results
* Perforating in a Clean Fluid with Differential Pressure Into Wellbore
* A Comparison between the GEO-VANN System and Other Perforating Methods in Wells Equipped with Packers
Completion and Workover Fluids
* Functions-Requirements-Selection Criteria
* Formation Damage Related to Solids
* Oil Fluids-Practical Application
* Conventional Water-Base Mud
* Oil Base or Invert-Emulsion Muds
* Foam
* Perforating Fluids
* Packer Fluids
* Well Killing
Through-Tubing Production Logging
* Introduction
* Logging Device
* Application of Through-Tubing Production logging
* Field Examples of Production Logging Techniques
* Primary Cement Evaluation
Problem Well Analysis
* Problem Wells
* Problem Well Analysis Checklist
Parafin and Asphaltene
* Introduction
* Paraffin and Asphaltene Chemistry
* Deposition Mechanisms
* Removal of Wax Deposits
* Preventing or Decreasing Wax Deposition
* Design of Wax Control
Squeeze Cementing-Remedial Cementing
* Introduction
* Theoretical Considerations
* Practical Considerations
* Special Squeeze Cementing Situations
* Planning a Squeeze Cement Job
* Normal Operational Procedures
* Other Operational Procedures
* Plug-Back Operations
* Special Cement Systems
Sand Control
* Introduction
* Reduction of Drag Force
* Mechanical Methods of Sand Control
* Practical Considerations in Gravel Packing
* Use of screen Without Gravel
* Resin Consolidation Methods
Formation Damage
* Introduction
* Basic Causes of Damage
* Classification of Damage Mechanisms
* Reduced Absolute Permeability
* Increased Fluid Viscosity (Emulsion)
* Diagnosis of Formation Damage
Surfactants for Well Treatments
* Characteristics of Surfactants
* Use and Action of Surfactant
* Formation Damage Susceptible to Surfactant Treatment
* Preventing or Removing Damage
* Well Stimulation With Surfactants
* Increasing Effectiveness of Rod Pumping
* Prevention of Well Damage
Acidizing
* Acids Used in Well Stimulation
* Acid Additives
* Carbonate Acidizing
* Acidizing Techniques for Caronat Formations
* Sandstone Acidizing
* Potential Safety Hazard in Acidizing
Hydraulic Fracturing
* Introduction
* Mechanics of Fracturing
* Production Increase from Fracturing
* Propping the Fracture
* Frac Fluids
* Frac Job Design
* Frac Job Evaluation Techniques
Scale Deposition,Removal,and Prevention
* Introduction
* Causes of Scale Deposition
* Prediction and Identification of Scale
* Scale Removal
* Scale Prevention
Corrosion Control
* The Corrosion Process
* Detection and Measurement of Corrosion
* Corrosion Control
Workover and Completion Rigs Workover System
* Conventional Production Rigs
* Non-Conventional Workovers System
* Concentric Tubing Workovers
Workover Planning
* Reasons for Workover
* Workover to Alleviate Formation Damage
* Workover for Low Permeability Well
* Workover of Wells in Partially Pressure-Depleted Reservoirs
* Workover to Reduces Water Production in Oil and Gas Wells
* Workover to Reduces Gas Production in Oil Wells
* Workover for Sand Control
* Workover to Repair Mechanical Failure
* Workover to Change Zones or Reservoirs
* Workover to Multicomplete
* Workover to Increase Production in Well Producing High Viscosity (Low Gravity) Oil
* Workover Economics
Course Leader:
Dr. Ir. Sudjati Rachmat, DEA graduated from Petroleum Engineering Department of ITB in 1979 and got his Doctorate Degree with honored in 1987 from Ecole Centrale de Lyon I, France . The topic of his thesis is Modelisation Numerique d’Ecoulements Polyphasiques en Milieux Poreux Application au Cas de Calcul des Champs de Pressions et de Saturations dans un Gisement de Petrole.
For the time being, he became a lecturer in Petroleum Engineering Department of ITB. His subjects are Analysis and Numerical Method, Engineering Mathematics, Computer Simulation, Flu id Mechanic, Artificial Intelligence for Petroleum Engineering.
He also gave many courses to the community, such as: basic reservoir engineering and reservoir simulation, basic production engineering, down hole well testing, statistic and numerical method for petroleum engineering, basic log interpretation, etc. He is a member of some profession organization such as: IATMI, SPE/EIME, IMA, HAIAI, FPS-USA, INAGA, and IGA.
Jadwal Pelatihan trainingterbaru Tahun 2023 :
- Batch 1 : 23 – 25 Januari 2024
- Batch 2 : 6 – 8 Februari 2024
- Batch 3 : 5 – 7 Maret 2024
- Batch 4 : 23 – 25 April 2024
- Batch 5 : 6 – 8 Mei 2024 || 20 – 22 Mei 2024
- Batch 6 : 11 – 13 Juni 2024
- Batch 7 : 16 – 18 Juli 2024
- Batch 8 : 20 – 22 Agustus 2024
- Batch 9 : 17 – 19 September 2024
- Batch 10 : 8 – 10 Oktober 2024 || 22 – 24 Oktober 2024
- Batch 11 : 5 – 7 November 2024 || 19 – 21 November 2024
- Batch 12 : 10 – 12 Desember 2024
Catatan : Jadwal dapat menyesuaikan dengan kebutuhan anda dengan catatan kuota peserta minimum 2 (dua) peserta terpenuhi. training accounting, taxation and auditing at coal for oil and gas industry terupdate
Biaya dan Lokasi Pelatihan : training accounting, taxation and auditing at coal for oil and gas industry terupdate
Lokasi : training akuntansi untuk migas terbaru
- Jakarta : Hotel Amaris Kemang, Amaris Tendean,Trinity Hotel, Ibis Budget.
- Bandung: Hotel Santika, Hay Hotel,Ibis Style, Novotel Hotel, Golden Flower Hotel, 1O1 Hotel, Grand Tjokro Hotel, Tune Hotel, Four Point by Sheraton Hotel.
- Yogyakarta : Hotel NEO+ Awana, Cordela Hotel,Ibis Style, Boutique Hotel, Cavinton Hotel, Mutiara Hotel, Dafam Malioboro Hotel, Prima Inn Hotel .
- Surabaya: Novotel Hotel, Ibis Center Hotel, HARRIS Hotel, Favehotel, Alana Hotel .
- Malang: Amaris Hotel, The 1O1 Hotel, Ibis Style Hotel, El Hotel, Whiz Prime Hotel .
- Bali : Ibis Kuta, Fontana Hotel, HARRIS Hotel & Conventions .
- Lombok: Favehotel, Novotel Lombok, D Praya Hotel .
Catatan : Biaya diatas belum termasuk akomodasi/penginapan. training akuntansi pertambangan umum terupdate
Investasi Pelatihan Training Terbaru : training akuntansi untuk migas mura
- Investasi pelatihan selama tiga hari tersebut menyesuaikan dengan jumlah peserta (on call). *Please feel free to contact us.
- Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.
Fasilitas Pelatihan Training Terbaru :
- FREE Airport pickup service (Gratis Antar jemput Hotel/Bandara)
- FREE Akomodasi Peserta ke tempat pelatihan .
- Module / Handout
- FREE Flashdisk .
- Sertifikat
- FREE Bag or bagpackers (Tas Training) .
- Training Kit (Dokumentasi photo, Blocknote, ATK, etc)
- 2xCoffe Break & 1 Lunch, Dinner.
- Souvenir .